Façade renovation, school building Höri

Façade renovation, school building Höri

Item

Öffentliches Gebäude

Type

Conversion / Restoration

Implementation

2014

Location

Schulhausstr. 17, 8181 Höri

Information

The school building dating from 1884 was comprehensively renovated. Energy efficient repair of the façade using Fixit 222 Aerogel High Performance Insulating Plaster.

Façade renovation, school building Höri

Involved companies

Architect

Gasser Partner AG, Bülach

Processor

Antonio Cafaro GmbH, Wetzikon ZH

Builder

Gemeinde Höri, Höri

Reference as PDF

OR Façade renovation, school building Höri en
PDF
2 MB

Further references

Cité Tony Garnier with gabled walls, F - Lyon

Cité Tony Garnier with gabled walls, F - Lyon

A building group consisting of 23 elements - each with an individual fresco: a unique open-air museum.

Town Council, Zweisimmen

Town Council, Zweisimmen

Since no significant changes to the appearance of the façade were permitted, the decision was made to use Fixit 222 Aerogel High Performance Insulating Plaster.

Old town council building, Zumikon

Old town council building, Zumikon

Renovation of the outdoor features of an old patrician house. Fixit 670 roughcast with Armanet over the entire area, 3cm layer of Fixit 222 Aerogel High Performance Insulating Plaster, Fixit 223 mesh embedding and then Fixit 203 final coat. PIR panels used for base cladding.

Renovation of old school building, Igis GR

Renovation of old school building, Igis GR

This object was insulated on the inside with 100 mm Fixit 222 high-performance thermal insulation plaster. In the basement, the exterior walls were renovated on the inside with Fixit 210 Hydroment. The facade was fully embedded with Fixit 462 and plastered with Fixit203 plaster with hydraulic lime.