The mayor's residence, Area Morges

Item

Historical building

Implementation

2014 - 2016

Type

Conversion / Restoration

Location

District Morges (VD)

Information

Chateau built in the 18th century.

Used products

Fixit 208

Basic mixture for restoration work

Fixit 222

Aerogel High Performance Insulating Plaster

Fixit 223

Special Embedding Mortar

Fixit 281

CalceClima® preparatory spray-on mortar

Involved companies

Architect

Pont12 Architectes

Processor

Caetano Frères

Further references

Retirement and nursing home Gampelen BE

A former manor house from the 17th century in Gampelen BE has been renovated for energy efficiency using Fixit 222 high-performance aerogel insulation plaster. Thanks to this, the historical appearance of today's old people's home could be preserved, the consumption of heating energy has been reduced and there is a pleasant indoor climate inside.

House of the curate, Bremgarten

Das spätgotische Gebäude diente vermutlich der 1460 gegründeten Bullingerpfründe als Kaplanei und wurde nach der Rekatholisierung 1531 zur Helferei. Die rund 500 Jahre alte Liegenschaft, welche mittlerweile unter Denkmalschutz steht, wurde im Laufe der Nutzungszeit immer wieder renoviert, letztmals vor 60 Jahren vollumfänglich und 1990 mit einer sanften Innen- und Aussenrenovation.

Energy efficient renovation Chesa Palmira, Bever

The Chesa Palmira was built in 1672, and the original floor plan has remained unchanged till today. The façade of this historic building was energy efficiently renovated by applying an 8 cm thick layer of Fixit 222 Aerogel High Performance Insulating Plaster. Fixit 208 was used for the final coat. Finally lime whitewash was applied to the façade and the identical sgraffito pattern from 1952 was carved into it.

Façade renovation, Barandun, Zillis

Façade renovation with Fixit 222 Aerogel High Performance Insulating Plaster. Existing base layer removed, masonry dry cleaned and the entire façade fixed with a tile rabitz. 3 – 5 cm of Fixit 222 was applied directly onto the tile rabitz. Then Fixit 733/734 Stucco final coat was applied and two layers of Fixit 784 paint rolled on.

Mill floor Madiswil BE

Since the historic building is covered by a preservation order, it was not possible to use mineral-wool insulation on its outdoor surfaces. The owners wished to retain the original character of the building, for which reason they decided that Fixit 222 High Performance Insulating Render should be used, also because the walls were bowed and not vertical. Internal renovation was carried out with a layer thickness of 30 – 80 mm of Fixit 222 Aerogel flexible high performance insulating plaster over quarry stone walls.

Old Mill, Sissach

The old mill, which was converted to a multiple family dwelling, was one of the first historically important buildings to undergo energy-efficient renovation using Fixit 222, a worldwide first. Subsequently Fixit 203 Finish Coat with hydraulic lime was applied to the façade of the protected building to faithfully reproduce the original plasterwork.

Castle hotel, Thun

Conversion of a correctional facility into hotel/restaurant premises. The main planning effort was focused on the protected façade of the building, from which modern constructional elements (bay windows) extended. Using our Aerogel High Performance Thermally Insulating Plaster, the 350 m² west façade was insulated in accordance with the requirements of the preservation authorities.